Problem:
ActivePresenter version: 8.0.6
OS: Windows 7
Notes:
Problem:
ActivePresenter version: 8.0.6
OS: Windows 7
Notes:
Hi,
Combining two different (*approj) projects is very simple, Harsh.
You just need to copy all slides in project A and paste them into project B. Then save the project B to get it done.
For more information, please refer to the first part (Copy Slides) in this article:
In another way, you can insert slides from ActivePresenter to your current project to achieve the same result.
See Insert Slides from ActivePresenter part in this article for details:
Kind regards,
Thuy
Dear Thuy, yes the slides can easily be transferred from one project to another.
However, as far as I can see, the project variables are not transferred between projects. Is there a way to import variables from a project into another project?
Thanks, Rolf.
Hi Rolf,
At this time, there is no way to do that, unfortunately.
Best regards,